The Musings of a Cinematic Globetrotter

Posts by Tim Holliday

Confusion Na Wa (Nigeria, 2013)

Directed by young filmmaker Kenneth Gyang, Confusion Na Wa (which I think translates to something like “Holy shit! Confusion!”—if I’m wrong, let me know) begins with a mysterious narrator,…

A Brief Sidenote

As I mentioned in my introductory post, this blog will be including some films from non-sovereign states in order to help me get from 197 up…